Duke University, Durham, N.C.

TEAM

The roofing crew installed about 6,500 square feet of pre-weathered 0.8-millimeter zinc.

The roofing crew installed about 6,500 square feet of pre-weathered 0.8-millimeter zinc.

GENERAL CONTRACTOR AND ROOFING CONTRACTOR: The Century Slate Co., Durham

ZINC FABRICATOR: K&M Sheet Metal, Durham

ROOF MATERIALS

The roofing crew installed about 6,500 square feet of pre-weathered 0.8-millimeter zinc.

ZINC PROVIDER: Jarden Zinc

ROOF REPORT

K&M Sheet Metal fabricated the standing-seam panels and custom built-in gutters. “There is approximately 130 feet of built-in gutter lining the west wall,” explains Mike Tenoever, president of The Century Slate Co. “The gutter was lined with 26-gauge type 304 stainless steel with lap-seamed and hand-soldered joints. “The team also refurbished and resealed all the existing skylights. The project required a “crazy” scaffold setup, Tenoever notes.

PHOTO: The Century Slate Co.